Wednesday, November 27, 2013

New Shore Doors

We kept the original doors from the first floor while we worked on getting the house livable but as the summer went on it was clear that the doors were in bad shape.  They were old and the water damage was causing some of the veneer to peel and crack.  We took measurements for all of the first floor doors and then we waited.  Lowe's finally ran a promotion for a free upgrade to a solid core (a savings of about $30 per door) so Andy and I stopped at Lowe's and placed an order for all new doors.  The old doors were flat slabs but we decided to go with 2-panel doors to match the hardwood doors on the second floor.

Old powder room door.

Old kitchen door.

New pre-hung doors that Andy and Kyle picked up a few weeks ago.

You know it's serious work when the Carhart bibs come out!

Shimming and leveling.


New kitchen door is already looking better.

New bedroom door that required an interesting cut at the top left corner to get the frame to fit.

Bathroom and kitchen doors.

New powder room door.

A few of the doors required some minor trimming in the bedroom for the carpet. Andy taped the edges and made the cuts.


With four new doors in place Andy still had the bi-fold doors to hang in the laundry area.

I sanded and painted the trim earlier in the weekend so that Andy could trim it to fit and rehang.

The bi-folds went in easily.



And we had a few extra knobs from our bookcase at home so they got put to good use.

While Andy worked inside I took all of the old trim outside, removed the hardware, sanded, primed and painted.  It took most of the weekend.


While Kodak barked at me to throw the ball that he wouldn't retrieve because the water was too cold.

About half of all the trim drying in the garage.

Andy had enough time to finish the edges of the white-washed ceiling with cove molding.


Thursday, August 29, 2013

A Shore Thing

It's a sure thing that no matter how much planning goes into a project at the shore something won't work out as planned.  The house turns out to not be very level or square which adds to it's character but also to the worker's frustration.  After Andy and Kyle got the cabinets hung in May it was clear that we had an issue with the ceiling.  You can see in the photo below how the top cabinet on the left touches the ceiling but there is a significant gap on the right.  The floor and ceiling aren't level and to keep the counters and cabinets level we ended up with this gap that made the room look unfinished.  Despite Andy's wishes to take some time off from the renovations this summer he and Kyle worked up a plan to level the ceiling and add some white-washed paneling.
 

In July SD, LD, and I white-washed all of the boards.    

Later in July, Kyle and Ashley came back down for a long weekend. First, Andy and Kyle located all of the studs and ran level string lines.






With the lines in place it was time to start lowering the ceiling with 2x4s, 1x2s. and shims.





The ceiling looked crazy with all of the shims in place, but it was time to start hanging the paneling.  





With the ceiling placed there was no more gap! One step closer to being finished!



Sunday, July 7, 2013

Epic Success

WARNING! This one is long.

We spent much of the winter and spring working at the shore to repair all of the damage from Hurricane Super Storm Sandy.  The house had at least 18" of water on the first floor and there was a lot of damage to the deck and dock caused by several large boats that floated in at the peak of the storm.  The house is getting back to normal but the dock suffered significant damage and we weren't sure how it was going to get fixed and really didn't think it would happen this summer with all of the other pressing projects.  I've been keeping track of the work in the shore in separate photo books so I haven't shared too much on the blog but this one is worth sharing!

Here is the dock before the storm.

And here it is after.
 

The pieces of the dock are designed to float in high water but they should generally stay between the pilings.  When we saw that all but one was missing we figured that they had been swept away in the storm.  As we started to investigate the yards and areas around the neighborhood we found every single missing piece (minus one bench)!

At the house next door two of the pieces were trapped under some debris and a boat.




The first full weekend we were allowed back to the property after the storm we cleared as much of the debris as we could and with the help of a neighbor carried the pieces to the side of the house and tied them up for the winter.  

This picture doesn't even show the full scale of all of the boats but the white boat with the blue cover is a 40' yacht that was stuck between the two houses.  We couldn't even walk between them.


Here is the same boat from a different angle.  That's Andy in front and a 2-story house in the back.


We found the last piece of the dock (and the largest) later that that month as were winterizing the house.  It was trapped under another large boat and a shed.  

Andy  marked it with our contact info and address and when the marina moved the boat they lifted the piece of dock back into the water.

While it was nice of the marina owner to crane the dock back in the water it was only tied to one piling and wasn't going to survive the winter in the water.  When we went down to check on the house in December Andy put on his wetsuit and tried to pull the dock out with the kayak.

When the kayak idea failed because the dock was just too heavy Andy decided to get in the bay.

It took Andy in the water and 4 people on land to pull the dock out of the water and get it propped on the bulkhead for the winter.  We had no idea how we were going to get the dock back in the water but knew that there was no chance of salvaging it if it spent the entire winter floating in the bay.

BS and JS came to help in April and Andy and BS were able to get the two pieces of dock that we found early on in the cleanup back in place. It wasn't perfect and a few boards were still missing but it was just nice to be able to walk back on the dock, even if only part way.
 

Later in the spring Andy bolted the floating sections of dock to the pilings.

He also managed to replace some missing boards and get the lower dock installed.  Complete with a ramp for Kodak.

Kodak could hardly contain his excitement.




We thought the dock repair ended there for the summer but as we talked through different ideas and options the neighbor convinced Andy that he could probably cut the large section in half and move it out in two pieces.  This may seem like the logical answer and it is possible that we were over-engineering a solution since we were convinced we needed ramps and winches to get the dock in place.

On Father's Day weekend Andy decided to make the cut.

I don't have any good photos because I got put to work, but Andy, my dad, and I were able to carry the pieces out to the end and get them almost in place.  Some of the pilings shifted during the storm and everything didn't line up the way it was supposed to.  



With some additional shimming and cutting Andy was able to get it back in the correct position.

He also managed to find some great chowder clams too.  We didn't keep these but they may not be so lucky next time!

The dock isn't perfect and it still needs some work to replace boards that were cut to help offset the seam and realign some areas that were temporarily patched but it looks wonderful considering that we weren't even sure we would have a dock this year.  Epic Success!



And a bench too!