Sunday, January 15, 2012

Prepping the Vanity

We are getting ever so close to hanging all of the drywall, but before we can do that there were a few things that we needed to check.  Because the vanities have drawers on one side the plumbing runs down right beside all of the drawers and there is very little room for error.  We carried all of the cabinets upstairs to check on the plumbing, cut out the backs of the cabinets for the piping, and mounted the electrical boxes for the new vanity lights so that we could make sure they were perfectly centered.


This laser level is awesome and made it easy to check that the center of the vanity and new light will line up perfectly.  

Cutting out the back of the vanity for the piping.

Test mounting to check for level.

Checking the plumbing alignment. 

It was nice to see all of the cabinets in place (even if only temporary).  It just means we are getting closer to a newly finished bathroom .  We even took turns fake brushing our teeth at our new sinks! 